Risk Radar
Track project risks owners impact and mitigation tasks.
What it does
- User can save board-level risk configuration (required columns + score settings) and reload it accurately.
- User can create or update a risk entry from item view with explicit loading, success, and error states.
- Risk score is deterministic: same input fields always produce the same score and severity label.
- A large board run processes 5,000 items using items_page + next_items_page with resumable checkpoints and no duplicate writes.
- Plan gating is enforced server-side via requirePlan; using paid-only bulk refresh or cross-board sync on lower plans returns 402.
Install steps
- From monday.com, open Marketplace and find this app listing.
- Click Install and choose the workspace where you want to enable it.
- Approve requested permissions.
- Open the app feature in a board, item, or dashboard and complete setup.
First-use steps
- Open the app in your monday workspace and authorize required scopes.
- Pick the target board or dashboard context.
- Apply your first configuration and save settings.
- Run one validation action and review the result panel.
Plans
| Plan | Price | What it unlocks |
|---|---|---|
| Free | $0/month | Max boards: 1; Max synced items per month: 250; Max bulk items per job: 500. |
| Starter | $11/month | Max boards: 5; Max synced items per month: 2000; Max bulk items per job: 2000. |
| Pro | $21/month | Max boards: 20; Max synced items per month: 15000; Max bulk items per job: 20000. |
| Scale | $39/month | Max boards: unlimited; Max synced items per month: unlimited; Max bulk items per job: unlimited. |
FAQ
Does this app store monday board content outside monday code?
No. The app stores operational configuration and per-item state required for app behavior inside monday code storage.
How can I request support?
Email [email protected] and include workspace ID, app name, and a short reproduction path.
What happens on uninstall?
Install-specific data is queued for deletion handling in line with marketplace requirements.
Support
Contact: [email protected]
If you open links from this page, they open in a new tab to keep this iframe-safe guide stable inside monday.com.